Late on 20 March 2025 a transformer fire at the North Hyde substation in west London cut power to Heathrow Airport, which stayed closed for most of 21 March. Official reviews later found that a fault detected in 2018 had not been fixed.

Aerial view of Heathrow Terminal 5 and its aprons seen from an aircraft after take-off (file photo)
Photo by Aero Icarus from Zürich, Switzerland | Source: Wikimedia Commons | License: CC BY-SA 2.0

On 21 March 2025, Heathrow Airport, the busiest airport in Europe, was closed for most of the day after a fire at an electrical substation a few kilometres away cut off its power. The fire started late on 20 March at the North Hyde substation in Hayes, west London, which is owned by National Grid. Hundreds of thousands of passengers around the world had their journeys disrupted. Two official reviews later examined why one substation fire could shut down a major international airport, and they reached clear conclusions.

The event at a glance

  • Fire began: late on 20 March 2025, at the North Hyde substation
  • Airport closed: 21 March 2025; Heathrow later described it as a 10-hour closure, with full operations on 22 March
  • Cause of the fire (NESO): most likely moisture in the insulation of a high-voltage transformer bushing, a fault first detected in 2018
  • Injuries: none were reported at the airport
  • Reviews: the Kelly Review for Heathrow (published 28 May 2025) and the National Energy System Operator (NESO) final report (July 2025)

What happened

North Hyde was one of three substations supplying Heathrow. When a transformer caught fire just before midnight, the London Fire Brigade fought the blaze through the night, and the power supply to the airport and to tens of thousands of homes and businesses in the area was lost. The two other substations remained available, but the airport’s own internal power network had to be reconfigured to take power from them. That work, done by hand through switching across a very large site, took many hours.

Heathrow decided early on 21 March to close the airport to protect the safety of passengers and staff, because systems such as baggage handling, fuel supply and terminal services could not run normally. Flights already on their way were diverted to other airports in the UK and Europe or returned to their departure points. Limited operations restarted later on 21 March, and the airport returned to its full schedule the next day. Press reports put the number of affected flights at more than 1,300.

The Kelly Review

Heathrow’s board asked former UK Transport Secretary Ruth Kelly, with Joan MacNaughton and Mark Brooker, to review the airport’s preparation and response. Their report, published on 28 May 2025, found that Heathrow had made the right decisions in exceptionally difficult circumstances and that different choices on the day would not have materially changed the outcome. It made recommendations, and stressed that planned investment in energy resilience would be key to reducing the impact of a similar event.

The NESO report

The National Energy System Operator, which runs Great Britain’s electricity system, published its final report in July 2025. According to NESO, the fire was most likely caused by moisture entering a 275 kV transformer bushing, leading to a catastrophic electrical failure. High moisture levels had been found in oil samples in 2018, but the follow-up actions were not carried out. The report also found weaknesses in the site’s fire protection, made 12 recommendations, and said that energy companies often do not know which of their customers are critical national infrastructure. The energy regulator Ofgem opened an investigation into National Grid’s maintenance.

Why it matters

For the aviation industry, the closure showed how much a modern airport depends on systems outside its own fence, and it raised questions, in the UK and elsewhere, about how quickly airports can switch to other power sources when one supply is lost. Heathrow incidents in our coverage also include the AAIB report on an A300 tail strike; for the ground infrastructure itself, see our guides to the airport runway and the apron.

Sources

Discussion

Start the discussion

Commenting on this event: Heathrow Airport Closed by the North Hyde Substation Fire (2025)

What do you think?

Have an account? to comment with your profile, or just add your name below.

Be respectful and stay on topic. A first comment is checked by our editors before it appears.